You don't have javascript enabled. Good luck with that.
Pencarian
Dua IPAL Komunal di Rawa Badak Selatan Siap Dioperasikan

Two Communal IPALs in Rawa Badak Selatan Ready to Operate

Two units of communal Wastewater Treatment Plant (IPAL) in Rawa Badak Selatan Urban Village, Koja, North Jakarta are ready to operate. These units are built with aid from Islamic Development Bank (IDB) funds.

Wastewater from each houses will be connected to IPAL through pipes

North Jakarta Regional Council Head, Bambang Setiono informed, two IPAL are located at RT 08 and RT 03 of RW 01, Rawa Badak Selatan. IPAL at RT 08 will serve 76 people while at RT 03 will serve 63 people.

E. Jakarta Builds Communal IPAL in Makasar

"Wastewater from each houses will be connected to IPAL through pipes. We have installed it before and it just need to be inaugurated," he mentioned, Thursday (2/22).

He added, pipes that connect house and IPAL main pipe have 3 inches and 4 inches diameter. While main pipe has six inches diameter.

He explained, wastewater from main pipe will be filtered into 40x40 cm tube called gas trap. Wastewater that contains of oil, soap, and fat will be filtered in that gas trap.

Filtered water will be collected in three tanks. Those tanks have different functions; to sort out bacteria, to purify water, and to store clear water. "Water filtration result can be used again later," he stated.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1680 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1470 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1330 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1111 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye797 personDessy Suciati